Barcis Dam

About This Project

Study of the discharge capacity of the dam, control of its hydraulic safety and design of the new spillway on the left bank, with a capacity of 1.000 m3/s, which discharges the water in a tunnel with a diameter of 9 m and a length of 275 m, to allow the discharge of the millennial revalued flood.

Country

Italy

Client

Edipower S.p.A. - Edison S.p.A. (Cellina Energy S.r.l.)

Date

2004-2018

Assignment

Design

Category
Hydraulic rehabilitation of dam